Eagle Scout project · Troop 838 · Dallas

Rainwater platforms & wayfinding markers

I planned, designed, and led a community build. I modeled the rainwater collection platforms in CAD, sourced the lumber and hardware, and ran build days with more than 25 volunteers. We then installed the platforms and a set of marker posts on site.

Role
Project manager & designer
Budget
$2,100+
Team
25+ volunteers
Recognition
Featured in a local Dallas newspaper
01 · Design

Plan in CAD first

The site needed level, sturdy bases for rain barrels on uneven ground, plus marker posts to help people find their way. Before buying anything, I modeled the platform frames in CAD so I could size the lumber, check how the barrels fit, and create a cut list. This kept costs within the $2,100+ budget.

A full water barrel is heavy, so the platforms needed short spans, closely spaced deck boards, and a frame built to stay level as the ground settled.

02 · Build

Leading 25+ volunteers

I split the work into stations so volunteers of different ages and skill levels could work safely at the same time. Frames were pre-assembled in a workshop, then carried to the site to be leveled and installed. I handled purchasing, scheduling, tool safety briefings, and quality checks, including checking level on every platform before it was finished.

  • Materials: pressure-treated lumber, bought and transported in batches
  • Workshop: frames laid out and assembled in parallel
  • On site: ground prepared, frames leveled, decks and railings attached
  • Markers: stenciled posts with solar caps, set in the ground at each location
03 · Result

Built and in use

$2,100+budget managed
25+volunteers led
Pressfeatured in a local Dallas newspaper

This project taught me that engineering is also logistics: turning a CAD model into a cut list and a materials order, then into a schedule that a group of volunteers can actually follow.